Civil and Drainage Improvements, Muswellbrook NSW

Project Description

Swietelsky Rail Australia (SRA) has recently secured a five-year panel contract with Australian Rail Track Corporation for rail and civil maintenance works across their national network.

SRA's drainage team successfully completed over 4.5km of drainage improvements and vegetation control during the November closedown. This project involved challenging areas through two large cuttings with restricted access, and embankment stabilisation around three bridge crossings over Muscle Creek.

The drainage team also upgraded two level crossing approaches, enhanced several nearby access roads, and improved safety features in preparation for future works. Despite the complexity of managing multiple worksites within a busy corridor, the team delivered everything on time, ensuring minimal disruption and maximum quality.

SRA Project Manager, Andrew Petersen, reflected on the success of the project, saying, "Our drainage team showed exceptional skill and coordination to meet all of the project's scope within the closedown. By improving the drainage and embankment stability around the bridges and crossings, we've ensured better long-term asset performance and safer conditions for all future rail operations in this corridor."

This project was delivered concurrently with SRA's Ballast Cleaning project in Baan Baa, NSW.

These simultaneous projects showcase Swietelsky Rail Australia's capability to successfully execute multi-disciplinary projects with exceptional outcomes. The team's expertise, advanced machinery, meticulous planning, and strong project management ensure every aspect of the work is completed efficiently and to the highest standards.

Project Stats:

  • Network | Hunter Valley, Heavy Haul
  • Location | Muswellbrook NSW
  • Scope | 4.5km Drainage works, civil maintenance, access road upgrades, embankment stabilisation and vegetation control
  • Project Completion | November 2024

Client

Australian Rail Track Corporation

Range of Services